Showing posts with label Metro Ridership. Show all posts
Showing posts with label Metro Ridership. Show all posts

21 Nov 2011

Yaara Metro Losing Rs 2.5 Lakh Per Day

That is, it is losing Rs 2.5 lakh per day on the currently running Reach-1, on top of the Rs 65 lakh per day due to delays.
The first train chugged at 4 pm on October 20, and the first day witnessed around 60,000 passengers. However, the joy ride season faded gradually and one month after the start of operations, the commuter figure stands at an average of 25,000 per day.  
The drop in revenue earned from tickets and smart cards was also inevitable as the season of joy rides gave way to the not-so-exciting weekday commuting. The BMRCL earned Rs 13 lakh on an average for the first few days after the inauguration.  
But currently, it reaches a daily figure of Rs 3.5 lakh with much difficulty. If this situation continues in the coming months, Metro will run on a loss of Rs 2.5 lakh everyday. 
At least if this wasn't an eyesore stinging the eyes every time one ventured out, it would've mattered a bit less.

18 Nov 2011

Yaara Metro Update


Revenue dips
On Reach-1, BMRCL claims that there is an increase in number of regular users of the services, even as the initial euphoria has died down. The revenue on the line has come down drastically compared to the first few days.  
On November 8, 29,233 people travelled in the Metro generating Rs 4.5 lakh while the same was 24,983 and Rs 3.78 lakh, respectively on November 9 and 24,289 and Rs 3.81 lakh on November 10. 
On November 11, 24,874 people travelled generating a revenue of Rs 3.63 lakh but on November 12 (Saturday) it went up to 43,000 and Rs 6.35 lakh.
We need one more inauguration to get the tourists back on the Metro.